<img height="1" width="1" style="display:none;" alt="" src="https://ct.pinterest.com/v3/?event=init&amp;tid=2614475636046&amp;noscript=1">

Send us your drawings and we'll reply within one working day

Emergency Lighting Testing

                                                     Last updated 6th November 2026
Fully functioning emergency lighting is a legal requirement in commercial properties such as offices, multi-storey buildings and buildings open to the public. To make sure it will work when it's needed, the emergency lighting system should be inspected and tested regularly, and the results recorded.

The testing rules have recently changed. BS EN 50172 was completely rewritten in 2024, and the UK code of practice, BS 5266-1, followed with a full revision in October 2025. The biggest change is a new requirement to measure light levels at handover and then at least every five years.

Key Takeaways

  • Testing is now set out in BS EN 50172:2024 (also numbered BS 5266-8:2024) and BS 5266-1:2025, replacing the 2004 and 2016 editions.
  • Central battery systems need a daily indicator check, and all systems need a monthly functional test and an annual full-duration test.
  • Illuminance must now be measured at initial verification and then once every five years, to confirm the system still meets BS EN 1838.
  • Automatic test systems must comply with BS EN 62034, but someone still needs to check the results and act on faults.
  • Every test, fault and repair must be recorded in the logbook.

Who Is Responsible for Emergency Lighting Testing?

Under the Regulatory Reform (Fire Safety) Order 2005, the Responsible Person, usually the employer, owner or occupier in control of the premises, must make sure the emergency lighting is maintained in good working order. This includes arranging regular testing and keeping records.

Initial testing at handover will usually be the responsibility of the installation contractor. The ongoing tests, including the five-year verification, are the responsibility of the Responsible Person, as noted in The Light Review.

Which Standards Cover Emergency Lighting Testing?

The two most important standards covering the minimum requirements for testing and maintenance of emergency lighting are:

Standard Role Replaces
BS EN 50172:2024 / BS 5266-8:2024 (dual-numbered) Sets the requirements for installation, verification, testing, maintenance and documentation BS EN 50172:2004 / BS 5266-8:2004
BS 5266-1:2025 UK code of practice, including recommendations for routine testing and certification BS 5266-1:2016

BS EN 50172 specifies requirements, while BS 5266-1 is a code of practice. They are supported by BS EN 1838:2024, which sets the light levels the system must achieve, and BS EN 62034, which covers automatic test systems.

According to BSI, BS EN 50172:2024 has been completely rewritten. It adds new requirements for handover and documentation and for automatic test systems, plus informative annexes on rated duration, activation times and on-site light measurements.

Manual or Self-Testing Emergency Lights?

Emergency lighting can be tested manually, but automated testing is recommended, particularly on larger or multi-site installations. The specifier can choose the type of testing and reporting required for each building.

  • Manual testing: a competent person simulates a mains failure, usually with a key switch, and checks each luminaire and sign by eye.
  • Self-test: each luminaire carries out its own functional and duration tests on a programme and shows its status with an indicator.
  • Addressable and DALI-2 systems: test results from every fitting are reported to a central controller or building management system, giving a live view across the site.

Automatic test systems must comply with BS EN 62034. They take away much of the manual work, but an automatic system still needs to be correctly set up, maintained and monitored. Someone still has to read the results, deal with failures and sign off the annual certificate. Find out more in How Self-Test Emergency Lighting Works.

How Often Should Emergency Lighting Be Tested?

Anyone responsible for a building needs to understand the emergency lighting testing schedule. Under BS EN 50172:2024, testing is carried out daily, monthly, annually and every five years.

Frequency Test Applies to
Daily Visual check of central power supply indicators Central battery systems
Monthly Functional test of every luminaire and sign All systems
Annually Full rated duration test and annual verification All systems
Every 5 years Illuminance measurements against BS EN 1838 All systems

Daily Emergency Lighting Checks

For central battery systems, check the indicators on the central power supply every day. This is a visual inspection to confirm the system is in the ready condition and doesn't need a test of operation. A record is usually only needed in the logbook when a fault is found.

Monthly Emergency Lighting Tests

According to BS EN 50172:2024, the monthly test should cover the following:

  • Switch each emergency luminaire and sign into emergency mode by simulating a failure of the normal lighting supply. Leave it long enough to make sure every light source is lit, while keeping it short enough to avoid damaging system components.
  • Check that every emergency luminaire and sign is present, clean and working correctly.
  • Restore the normal supply and check any indicator shows the normal supply has been restored.
  • Check that system monitors are working correctly.
  • Record the date and the result in the logbook.

Where an automatic test system is used, the monthly test is met by checking the status of the indicators or remote displays.

Annual Emergency Lighting Tests

At least once a year, each luminaire and internally illuminated sign should be tested for its full rated duration, typically three hours. This is part of a wider annual verification, which also includes a visual inspection of the whole system.

  • Simulate a supply failure for the full rated duration and check that every luminaire is still lit at the end.
  • Restore the normal supply and check any indicator lamp or device shows normal supply has been restored and the batteries are charging.
  • Record the date, the results and any repairs in the emergency lighting logbook.

Full-duration tests leave the building with reduced protection while the batteries recharge. Carry them out at times of low risk, such as when the building is unoccupied, or test alternate luminaires so that half the system stays fully charged.

Five-Year Photometric Verification

This is the most significant change in the 2024 and 2025 standards. Clause 7.4.5 of BS EN 50172:2024 requires illuminance measurements to be carried out once every five years, to confirm that the system still meets the BS EN 1838 light levels used for its design.

Light levels can drop over time because of ageing equipment, dirt, refits, partition changes, ceiling alterations or a change of use. Five-year verification makes sure these changes don't quietly leave escape routes under-lit. BS 5266-1:2025 recommends photometric verification both at handover and at intervals not exceeding five years, as reported by Electrotechnical News.

Annex B of BS EN 50172:2024 gives four possible on-site measurement methods. Measurements need sensitive illuminance meters, and stray light has to be accounted for, so this work is best carried out by a competent specialist (The Light Review).

Initial Verification and Handover

Testing starts before the building is occupied. BS EN 50172:2024 adds new requirements for initial verification, including checking the light levels against BS EN 1838, according to the LIA.

The results of the commissioning inspections and tests should be included in the handover documents, and any deliberate departures from BS 5266-1 in the specification or design should be clearly recorded (Electrotechnical News). These initial measurements become the benchmark for the five-year verification.

Prolonged Shutdowns

The new standards also cover buildings that are locked down or left without power for long periods. Batteries can be damaged by deep discharge, so the system should be protected during a shutdown and properly recommissioned before the building is reoccupied. This should include a functional test and, where needed, a full-duration test once the batteries have recharged.

Emergency Lighting Logbook

A logbook must be kept on the premises, in the care of the Responsible Person and available for inspection by the fire authority. It can be paper or electronic, and the level of detail will depend on the size of the in

Send us your drawings

We reply within one working day with fittings, layouts and calculations, and a quote you can price against.

Request a quote

Or call London 020 3773 7530 or Bristol 0117 942 2512