Data Centre, Amsterdam.

Project summary

Location: Amsterdam
Sector: Data centres
Client: Undisclosed
Architect: Hyphen
Consultant: Dunton Associates 
M&E Contractor: Kirby
Value: £200K+ (ongoing)
Duration: 18 months
Size:  315,910 sq. ft
Visuals: 299 Lighting

At a glance: Data Centre, Amsterdam is a data centre project. 299 Lighting provided the lighting, working with Hyphen (architect) and Dunton Associates (consultant). The scheme covers 315,910 sq. ft.

The data centre project in Amsterdam is a testimony to our team's technical capability.  The Amsterdam work is one of a string of data centre projects for the leading data centre provider.

Although the Amsterdam site doesn't have its own individual sustainability rating, the EcoVadis Gold rating applies to the company as a whole and boasts high sustainability credentials.

 

 


Designed by Hyphen Architects  and brought to life by Kirby Group, the site in Amsterdam consists of two new 27MW buildings. 

 

Data Hall Render 3

200 Hours of Lighting Design

Working closely with the consultant and contractor, our lighting engineers delivered a completely custom, mission-critical lighting solution, while meeting all essential criteria for this type of project. Designing and manufacturing a completely new light fitting aside, this project was heavily focused around lighting design and calculations- as a mission critical building the lighting design requires every detail like the horizontal and vertical calculation with a strong emphasis on UGR levels.

Data centres require high output light fittings delivering 500 lux on the working plane, but also with UGR rating less than 19. These fittings also need to be temperature tested, as they have to be able to withstand extreme high and low temperatures.

Over 200 hours of lighting design, including very detailed emergency lighting design, were allocated to secure and support this complex project.

CRAH Render 1
Data Hall Render 2

The design brief

A standout feature of the Amsterdam data centre is the Gordon Grid ceiling - a widely used solution in mission critical environments due to its flexibility and ability to support direct suspension of cables and equipment. To ensure compatibility with this ceiling system, we were tasked with designing and manufacturing an entirely new light fitting tailored to meet the specific demands of the project.


Corridor Render 1

What was the most challenging aspect of the project?

“It was definitely the lighting design and the very precise calculations. Understandably, the functionality and reliability are of top importance with this type of work. Mission-critical projects are more challenging than our usual large scale CAT A fit out projects ."

Custom Lighting

Following the design brief, we designed a completely new luminaire that met the client's criteria and works with the Gordon Grid. Working samples have been supplied to the design team and our engineers also attended the site in Amsterdam. After the sample sign off, the fitting had to pass all testing required for mission critical spaces.
The custom fitting was used across data halls, corridors and CRAH gallery (computer room air handling gallery).

All custom lighting was manufactured in an 8-10 week lead time and tested for extreme temperatures. It was  supplied in 4000K colour temperature. The fittings are non dimmable, but are equipped with PIR sensors, that would turn on the light in the aisles when people walk in.

All lighting for this project phase was delivered on time over several stages, for completion of the phase in Q4 2024.  The final result is a highly functional scheme designed with sustainability and reliability in mind. We are very proud to have been part of this fantastic development. 


Project in figures:

200 Hours of Lighting Design

20 Revisions

1000 Custom light fittings

Working on a mission critical building?

We are experts in delivering lighting for data centres and mission critical style projects. Talk to us to see how we can help.

Working on a mission critical building?

We are experts in delivering lighting for data centres and mission critical style projects. Talk to us to see how we can help.

Planning something similar?

Send us your drawings or schedule and we will reply within one working day. Layouts and calculations are included when we supply the fittings.

  • Architects & interior designers: samples, finishes and made-to-measure options
  • Contractors: fast quotes, lead times and delivery to programme
  • M&E consultants: photometrics, BIM, LDT files and calculations

Send us your drawings

We reply within one working day with fittings, layouts and calculations, and a quote you can price against.

Request a quote

Or call London 020 3773 7530 or Bristol 0117 942 2512