

Following a successful cooperation on several projects in the last few years, we were approached by HCL Interiors in January 2020 with a lighting design specification for this project. Working closely with the M&E contractor, we progressed this fast paced project with site visits followed by lighting design and calculations, ensuring correct office lighting was specified and supplied within a short time scale. The scheme was set to achieve the current CIBSE Code for Lighting, which indicates the performance specification requirements for the various areas in the building.